March 20 2016 Second assembly prototype build by Stephen L Ward Skyrise Productions, Inc.
March 2016 Second assembly
January 2016 First assembly with 60 degree from vertical adjustment
Unpinned and not pressed together this is the first set of parts complete
December 2015
November 2015
This is the beginning of the joist fabrication.
This miniature ball joint allows about 45 degrees of adjustment.
When the nut is locked on the underside, the ball is locked in position.
The programming and set are complete for these parts , we just need 6 sets like this to complete the first 3 assemblies.